Home > Application > robots > Loading/Unloading
Loading/Unloading
GSK RB08 Transfer Robot Applied to Load/Unload for the Machining Center
Customer Requirements
- One robot with two CNC machines consists of one set of robot loading/unloading system;
- The 1st machining center machines the part’s yellow end and inner bore, and the 2nd does the green inner bore;
- One cycle time takes 57s to completely machine a part.
Application Effect
- The workpiece clamped on the machine is positioned by a pin to gain high accuracy;
- Using two loading machines, the robot normally operates to guarantee continuous production process when reloading is performed;
- High machining, loading/unloading efficiency does not occupy the turning machine’s wait time to realize 100% machining time utilization in the whole process.