Home > Application > robots > Loading/Unloading
Loading/Unloading
Application of GSK RB08 Robot on Loading/Unloading of Assembly Line from Qingyuan Company

Customer Requirement:
- It should be replaced the labor force to complete the components loading/unloading of assembly line nodes.
Troubleshooting:
- Using three RB08 robots to perform the loading/unloading on each node, which can be completed the assembly operations by equipping with the tray, vibration disk, assembly workpiece, truss manipulator and integrated control.
Application Effect:
- It can be released the labor force from the dull and repeated works.
- 24 hours working.