Home > Application > robots > Loading/Unloading
Loading/Unloading
GSK15L Robot Applies to the Automatic Production Line of Motorcycle’s engine cabinet

Customer Requirement
- Robot replaces the manual to perform the chip-blowing, loading/unloading of the left and right cabinets;
- The left cabinet can be completed 5 processes and the right one can be finished 4.
Troubleshooting - There are 3 separated processing units: left, right and the middle;
- Three tables of RB15L transportation robots are captured the workpiece from conveyer belt to perform the chip-blowing of the workpiece and loading or unloading of machining center.
Application Effect - The robot can be replaces the manual for operating 24hours and completing the tasks stably;
- Reduce the numbers of manual and shorten the labor intensity.